Atlanta, GA · Reviewed November 2026

Atlanta benchmarking compliance, filed for you

The Atlanta Commercial Buildings Energy Efficiency Ordinance requires covered buildings to report energy and water use every year. We gather the data, check it, and file it — usually within a week.

Who’s covered

Commercial and multifamily buildings over 25,000 sq ft, and city buildings over 10,000 sq ft.

Annual deadline

June 1 for the previous calendar year. Atlanta extended the 2026 deadline to July 1.

Verification

No routine third-party verification — but the program runs its own data checks, so accuracy still matters.

Penalties

A written warning at 30 days late, then a $1,000 fine a month later and $1,000 more for each later year out of compliance.

What is Atlanta’s Commercial Buildings Energy Efficiency Ordinance?

Atlanta’s Commercial Buildings Energy Efficiency Ordinance (CBEEO), passed in 2015, made Atlanta the first major Southeast city to require energy benchmarking. Owners of commercial and multifamily buildings over 25,000 sq ft must benchmark energy and water use in ENERGY STAR Portfolio Manager and report it to the city every year.

The ordinance also requires an ASHRAE Level II energy audit every 10 years, on a schedule set by the last digit of each building’s ATL Building ID. High-performing buildings can qualify for an audit exemption.

The program is run by the City of Atlanta’s Mayor’s Office of Resilience, and benchmarking results are published to help owners and tenants compare buildings.

Key dates

January–AprilRequest aggregated data from Georgia Power and your gas marketer
June 1Annual benchmarking report due (2026 was extended to July 1)
Dec 31, 2026ASHRAE Level II audit due: ATL Building IDs ending in 6
Every 10 yearsEach building’s audit repeats on its cycle

We confirm current Atlanta dates and your audit year before every filing.

Is your building covered?

CBEEO covers commercial and multifamily buildings over 25,000 sq ft and city-owned buildings over 10,000 sq ft within Atlanta city limits. Each covered building has an ATL Building ID, published on the city’s covered buildings list.

Buildings without a certificate of occupancy for the reporting year may be exempt from that year’s benchmarking.

What to report

All energy and water used by the whole building — including tenant spaces — for January 1 to December 31:

  • Electricity — every meter serving the building
  • Natural gas
  • District steam, hot or chilled water, if you have it
  • Delivered fuels (oil, diesel, propane) — all delivery receipts for the year
  • On-site solar production, if any
  • Water — whole-building water use

Leave out backup generator fuel. Note any meters added or removed during the year.

Good to know

  • Covered buildings also need an energy audit every 10 years.

What we’ll need from you

  • Building address, plus any utility service addresses that differ from it
  • Gross floor area for the whole building and each use (office, retail, residential…), number of units and year built
  • Your Atlanta Building ID (we can look it up)
  • Utility data for the full calendar year, January 1 – December 31 (usually 13 months of bills)
  • If tenants pay their own utilities: whole-building (aggregated) data from the utility, or signed tenant authorization forms
  • Access to your ENERGY STAR Portfolio Manager account, if you have one
  • Any notice or letter you received about this law
Step by step

How to comply

  1. Find your ATL Building IDLook it up on the city’s covered buildings list. The last digit sets your audit year.
  2. Set up Portfolio ManagerEnter floor area, property uses and details, and the ATL Building ID.
  3. Collect whole-building energy and water dataRequest aggregated data from Georgia Power, your natural gas marketer and the Department of Watershed Management.
  4. Submit by June 1Send the report to the city and keep the confirmation.
  5. Complete your 10-year audit when dueHave a qualified auditor perform an ASHRAE Level II audit and submit the summary — or request an exemption.

Atlanta audit exemptions and deferrals

ENERGY STAR or LEED

Buildings with ENERGY STAR certification, or LEED for Operations and Maintenance, in two of the last three years may be exempt.

High performance

Buildings with an EUI well below similar buildings, or that have improved significantly, may qualify.

Deferrals

New buildings under 10 years old and substantially improved buildings that meet current energy code can defer the audit.

Exemptions and extensions

The city has extended the benchmarking deadline in some years (to July 1 in 2026). Buildings without a certificate of occupancy for the year can request an exemption, and high-performing buildings can request an audit exemption or deferral.

Atlanta first issues a written warning; if a building still hasn’t reported within 30 days, the city can impose a $1,000 fine, with further fines for continued non-compliance.

Common mistakes we fix

  • Missing the 10-year audit year tied to the ATL Building ID
  • Leaving out water, which Atlanta requires
  • Missing tenant-paid Georgia Power meters
  • Not requesting an audit exemption a high-performing building qualifies for
  • Using the wrong building ID on a multi-building site

How 1st Green Choice helps

We file Atlanta benchmarking reports for offices, multifamily, hotels and retail. We find your ATL Building ID, request whole-building energy and water data, set up Portfolio Manager and submit by the deadline — and track your audit year so you can apply for an exemption if your building qualifies.

FAQ

Atlanta benchmarking questions

When is the Atlanta benchmarking deadline?
June 1 each year. Atlanta extended the 2026 deadline to July 1.
Which Atlanta buildings must benchmark?
Commercial and multifamily buildings over 25,000 square feet and city-owned buildings over 10,000 square feet.
How often is an energy audit required in Atlanta?
An ASHRAE Level II audit every 10 years, on a schedule set by the last digit of the ATL Building ID. IDs ending in 6 are due December 31, 2026.
Can I be exempt from the Atlanta audit?
Yes, with ENERGY STAR certification or LEED O+M in two of the last three years, or by showing high or improved performance. New and substantially improved buildings can defer.
What are the penalties?
A written warning first, then a $1,000 fine if the building hasn’t reported within 30 days, with further fines for continued non-compliance.
Is water required in Atlanta?
Yes. Atlanta requires both energy and water benchmarking.
Where do I find my ATL Building ID?
On the city’s covered buildings list. We can look it up for you.
Is third-party verification required?
No routine third-party data verification is required, but the 10-year audit must be done by a qualified auditor.

Official sources: City of Atlanta — Commercial Buildings Energy Efficiency Ordinance. Requirements change — we confirm current rules for every filing.

Let us handle your Atlanta benchmarking filing

Get a free quote
Scroll to Top