Detroit benchmarking compliance, filed for you
The Detroit Energy and Water Benchmarking Ordinance requires covered buildings to report energy and water use every year. We gather the data, check it, and file it — usually within a week.
Who’s covered
Commercial and multifamily buildings of 25,000 sq ft or more (buildings over 100,000 sq ft started in 2024, the rest in 2025), plus city buildings of 10,000 sq ft or more.
Annual deadline
June 1 for the previous calendar year.
Verification
Data verification every three years.
Penalties
A blight violation notice with a civil fine.
What is Detroit’s benchmarking ordinance?
Detroit’s City Council unanimously adopted the Energy and Water Benchmarking Ordinance (Ordinance 2023-42) in November 2023 as one of the first actions in the Detroit Climate Strategy. Owners of large buildings must report a year of energy and water use through ENERGY STAR Portfolio Manager by June 1 each year.
Detroit also requires a certified professional to attest to the accuracy of the data before a building’s first deadline and every third deadline after that. Tenants are required to give owners the data they need.
There are no penalties for failing to reduce energy use — the ordinance is about measurement and transparency.
Key dates
| Oct 1, 2024 | First reports from buildings 100,000+ sq ft (2023 data) |
| June 1, 2025 | First reports from buildings 25,000–100,000 sq ft (2024 data) |
| June 1 | Annual report due every year |
| Every 3rd deadline | Data verified by a certified professional |
We confirm current Detroit dates and your verification year before every filing.
Is your building covered?
The ordinance covers commercial, industrial and multifamily buildings over 25,000 sq ft in the City of Detroit, plus municipal buildings. Each building has a Detroit Building ID, available from the city’s lookup tool.
Vacant buildings, buildings slated for demolition and buildings under 25,000 sq ft can request an exemption.
What to report
All energy and water used by the whole building — including tenant spaces — for January 1 to December 31:
- Electricity — every meter serving the building
- Natural gas
- District steam, hot or chilled water, if you have it
- Delivered fuels (oil, diesel, propane) — all delivery receipts for the year
- On-site solar production, if any
- Water — whole-building water use
Leave out backup generator fuel. Note any meters added or removed during the year.
Good to know
- Exemptions exist for low occupancy, demolition, missing occupancy certificates and data that can’t be obtained.
What we’ll need from you
- Building address, plus any utility service addresses that differ from it
- Gross floor area for the whole building and each use (office, retail, residential…), number of units and year built
- Your Detroit Building ID (we can look it up)
- Utility data for the full calendar year, January 1 – December 31 (usually 13 months of bills)
- If tenants pay their own utilities: whole-building (aggregated) data from the utility, or signed tenant authorization forms
- Access to your ENERGY STAR Portfolio Manager account, if you have one
- Any notice or letter you received about this law
How to comply
- Look up your Detroit Building IDUse the city’s Building ID lookup tool.
- Set up Portfolio ManagerEnter floor area, property uses and details, and add the Detroit Building ID.
- Collect whole-building energy and water dataUse DTE Energy’s Data Hub for aggregated electric and gas data, plus Detroit Water and Sewerage data.
- Verify in verification yearsHave a certified professional attest to the data before your first deadline and every third deadline.
- Share with the city by June 1Share the property with the City of Detroit in Portfolio Manager.
Exemptions and extensions
Whole-building exemptions are available for vacant buildings, buildings slated for demolition and buildings under 25,000 sq ft. The city also offers free technical assistance for affordable multifamily, houses of worship, childcare facilities and non-profits.
Common mistakes we fix
- Missing the Detroit Building ID in Portfolio Manager
- Skipping the verification year
- Leaving out water use
- Not using DTE’s Data Hub for whole-building data
- Not asking tenants for data they’re required to provide
How 1st Green Choice helps
We file Detroit benchmarking reports for offices, multifamily, industrial and institutional buildings. We pull whole-building data through DTE’s Data Hub, include water use, handle the certified-professional verification with our in-house PEs and share with the city by June 1.
Detroit benchmarking questions
When is the Detroit benchmarking deadline?
Which Detroit buildings must benchmark?
Is verification required in Detroit?
Are there penalties for not reducing energy use?
How do I get whole-building data?
Do tenants have to share data?
Can I get an exemption?
Is free help available?
Official sources: City of Detroit — Energy and Water Benchmarking Ordinance. Requirements change — we confirm current rules for every filing.
