DC benchmarking compliance, filed for you
Clean and Affordable Energy Act benchmarking + Building Energy Performance Standards (BEPS) requires covered buildings in Washington, DC to report energy and water use every year. We gather the data, check it, and file it — usually within a week.
Who’s covered
Privately owned buildings of 10,000 sq ft and up (expanded for calendar year 2025 data), and District-owned buildings over 10,000 sq ft.
Annual deadline
May 1 for the previous calendar year. DC moved its annual deadline to May 1 by recent legislation.
Verification
Third-party data verification every three years, by someone other than the person who did the benchmarking.
Penalties
Up to $100 per day for benchmarking. Missing BEPS targets can cost up to $10 per sq ft (capped at $7.5 million).
What are DC’s benchmarking and BEPS requirements?
Washington, DC has two connected laws. The Clean and Affordable Energy Act of 2008 requires buildings to benchmark their energy and water use in ENERGY STAR Portfolio Manager every year and report it to the Department of Energy and Environment (DOEE), which publishes the results. The Clean Energy DC Omnibus Act of 2018 added Building Energy Performance Standards (BEPS) — minimum performance levels that buildings must meet over multi-year compliance cycles.
Coverage has expanded steadily. Private buildings over 50,000 sq ft started benchmarking in 2013, buildings over 25,000 sq ft followed, and starting with calendar year 2025 data all privately owned buildings of 10,000 sq ft or more must benchmark. DC also requires third-party data verification every three years.
Your benchmarking data is how DOEE measures BEPS compliance, so accurate annual reporting matters even more in DC than in most cities.
Key dates
| January–March | Collect last year’s bills; request aggregated data from Pepco and Washington Gas |
| May 1 | Annual benchmarking report due (May 3 in 2027, since May 1 falls on a weekend) |
| Every 3 years | Third-party verified data — calendar year 2026 data, due in 2027, is a verification year |
| Dec 31, 2026 | BEPS Cycle 1 ends for private buildings over 50,000 sq ft |
| 2027 | Cycle 1 buildings submit end-of-cycle documentation; DOEE begins assessing penalties |
| Later cycles | BEPS extends to buildings of 25,000+ sq ft, then 10,000+ sq ft |
DC moved its benchmarking deadline from April 1 to May 1 by recent legislation. We confirm current dates with DOEE before every filing.
Is your building covered?
You must benchmark in DC if you own:
- A privately owned building of 10,000 gross sq ft or more (starting with calendar year 2025 data, reported in 2026).
- A District-owned building of 10,000 sq ft or more.
BEPS performance requirements apply in cycles. Cycle 1 (2021–2026) covered privately owned buildings over 50,000 sq ft and District buildings over 10,000 sq ft. Smaller private buildings come under BEPS in later cycles — first 25,000+ sq ft, then 10,000+ sq ft. Each building is identified by its DC Real Property Unique ID (SSL) in Portfolio Manager.
What to report
All energy and water used by the whole building — including tenant spaces — for January 1 to December 31:
- Electricity — every meter serving the building
- Natural gas
- District steam, hot or chilled water, if you have it
- Delivered fuels (oil, diesel, propane) — all delivery receipts for the year
- On-site solar production, if any
- Water — whole-building water use
Leave out backup generator fuel. Note any meters added or removed during the year.
Good to know
- BEPS compares your building to a performance standard every six years; Cycle 1 ends in 2026.
- DOEE publishes each building’s results publicly.
What we’ll need from you
- Building address, plus any utility service addresses that differ from it
- Gross floor area for the whole building and each use (office, retail, residential…), number of units and year built
- Your DC Real Property Unique ID (PID / SSL) (we can look it up)
- Utility data for the full calendar year, January 1 – December 31 (usually 13 months of bills)
- If tenants pay their own utilities: whole-building (aggregated) data from the utility, or signed tenant authorization forms
- Access to your ENERGY STAR Portfolio Manager account, if you have one
- Any notice or letter you received from the city
How to comply
- Confirm your building’s statusCheck DOEE’s covered buildings list and your building’s SSL. Buildings between 10,000 and 25,000 sq ft are newly covered — many have never benchmarked.
- Set up Portfolio ManagerEnter gross floor area, property uses and details, and add the DC Real Property Unique ID.
- Collect whole-building energy and water dataRequest aggregated data from Pepco and Washington Gas; add DC Water, district steam and delivered fuels.
- Arrange third-party verification in verification yearsA verifier who did not prepare the benchmarking data reviews and signs off before submission.
- Submit by May 1Send your data through DOEE’s Portfolio Manager reporting link and keep the confirmation.
- Check your BEPS statusCompare your ENERGY STAR score (or source EUI) with the BEPS standard for your property type and cycle, and plan a compliance pathway if you’re below it.
BEPS at a glance
The standard
DOEE sets a minimum ENERGY STAR score (or source EUI) for each property type, based on the median performance of DC buildings. Buildings below it must improve during the cycle.
Compliance pathways
Below-standard buildings choose a pathway — performance (cut site EUI by 20%), prescriptive (install specified efficiency measures) or a standard target — and document progress.
Penalties
Buildings that don’t meet BEPS can face alternative compliance penalties of up to $10 per square foot, capped at $7.5 million per property, reduced in proportion to the progress achieved.
Exemptions and extensions
DOEE offers delays and exemptions in specific situations — for example, financial distress, low occupancy, or buildings that are newly constructed or being substantially renovated. Requests need supporting documentation and must be filed by DOEE’s deadline, which falls before the reporting deadline.
For benchmarking itself, the cleanest approach is to file on time: late or missing benchmarking reports can bring fines of up to $100 per day, separate from any BEPS penalty.
If your building is on DOEE’s list in error, contact DOEE with records showing why it isn’t covered.
Common mistakes we fix
- Assuming a 10,000–25,000 sq ft building is exempt — it has been required to benchmark since calendar year 2025 data
- Missing a three-year verification year, or having the same person benchmark and verify
- Missing the DC Real Property Unique ID, so DOEE can’t match the report
- Leaving out tenant-paid Pepco meters in multi-tenant buildings
- Using an outdated floor area that changes your score — and your BEPS result
- Not checking BEPS status until after the cycle ends
How 1st Green Choice helps
We file DC benchmarking reports for offices, multifamily and condo buildings, hotels, retail and institutional properties — including the many 10,000–25,000 sq ft buildings that are benchmarking for the first time. We set up Portfolio Manager with the correct ID, request whole-building data from Pepco and Washington Gas, arrange independent verification in verification years and submit by DOEE’s deadline.
Because DC’s benchmarking data drives BEPS, we show you where your building stands against the standard each year so you can plan improvements before penalties are on the table.
DC benchmarking questions
When is the DC energy benchmarking deadline?
Which DC buildings must benchmark?
How often does DC require third-party verification?
What is the penalty for not benchmarking in DC?
What is DC BEPS?
What happens if my building doesn’t meet BEPS?
When does BEPS apply to smaller buildings?
Does DC benchmarking include water?
Official sources: DOEE — Energy benchmarking · DOEE — Building Energy Performance Standards. Requirements change — we confirm current rules for every filing.