The Cambridge Building Energy Use Disclosure Ordinance (BEUDO) requires covered buildings to report energy and water use every year. We gather the data, check it, and file it — usually within a week.
Who’s covered
Non-residential buildings of 25,000 sq ft or more, residential buildings with 50 or more units, and city buildings over 10,000 sq ft.
Annual deadline
May 1 for the previous calendar year.
Verification
Third-party data verification for larger buildings on the city’s schedule.
Penalties
A warning for a first violation, then up to $300 per day.
What is Cambridge BEUDO?
Cambridge’s Building Energy Use Disclosure Ordinance (BEUDO), Chapter 8.67 of the municipal code, has required large buildings to report energy and water use since 2014. In 2023 the city amended it to add emissions reduction requirements leading to net zero — among the most aggressive timelines in the country.
Large non-residential buildings (100,000+ sq ft) must keep emissions at or below 80% of their baseline for 2026–2029 and reach net zero by 2035. Mid-size non-residential buildings (25,000–100,000 sq ft) start reductions in 2030 and reach net zero by 2050. Residential properties continue to report energy and water use but don’t have emissions requirements.
Baseline data must be third-party verified by an individual certified by an approved verification body.
Key dates
| May 1 | Annual energy and water report due for the previous calendar year |
| 2026–2029 | Compliance Period 1: large non-residential buildings at or below 80% of baseline |
| May 1, 2027 | Verified baseline documentation due |
| 2030 | Emissions reductions begin for 25,000–100,000 sq ft non-residential buildings |
| 2035 / 2050 | Net zero: large non-residential by 2035, mid-size by 2050 |
Cambridge finalized new BEUDO regulations in August 2026. We confirm your requirements before every filing.
Is your building covered?
BEUDO covers non-residential properties of 25,000 sq ft or more and residential properties with 50 or more units in Cambridge, plus municipal buildings. Properties with several buildings can be grouped in different ways, and mixed-use buildings can omit residential space from emissions requirements.
Owners report through the city’s BEAM portal. The state’s LBER law also applies — including to Cambridge buildings between 20,000 and 25,000 sq ft that BEUDO doesn’t cover.
What to report
All energy and water used by the whole building — including tenant spaces — for January 1 to December 31:
- Electricity — every meter serving the building
- Natural gas
- District steam, hot or chilled water, if you have it
- Delivered fuels (oil, diesel, propane) — all delivery receipts for the year
- On-site solar production, if any
- Water — whole-building water use
Leave out backup generator fuel. Note any meters added or removed during the year.
Good to know
- BEUDO now includes emissions reduction requirements that tighten toward net zero.
- Massachusetts’s statewide program may also apply.
What we’ll need from you
- Building address, plus any utility service addresses that differ from it
- Gross floor area for the whole building and each use (office, retail, residential…), number of units and year built
- Your Cambridge BEUDO ID (we can look it up)
- Utility data for the full calendar year, January 1 – December 31 (usually 13 months of bills)
- If tenants pay their own utilities: whole-building (aggregated) data from the utility, or signed tenant authorization forms
- Access to your ENERGY STAR Portfolio Manager account, if you have one
- Any notice or letter you received about this law
How to comply
- Set up your BEAM owner accountConfigure the Covered Property and confirm how buildings are grouped.
- Benchmark in Portfolio ManagerReport whole-building energy and water use for the previous calendar year.
- Collect whole-building dataRequest aggregated data from Eversource; add steam, delivered fuels and Cambridge Water Department data.
- Verify your baselineHave baseline data verified by an individual certified by an approved verification body by May 1, 2027.
- Submit by May 1File through the BEAM portal and keep the confirmation.
- Track emissions against your limitCompare emissions with your Compliance Period 1 limit and plan reductions.
Flexibility options
Campus reporting
Organizations with five or more BEUDO buildings can report as a single campus.
Hardship compliance plans
Owners facing significant challenges can apply for temporary relief.
Deferral plans
Owners planning a deep retrofit can request to defer reductions until the project is complete.
Exemptions and extensions
Cambridge offers hardship compliance plans, deferral plans and alternative configurations, each with its own application. Owners must be up to date on reporting to qualify.
Penalties apply for failing to report or meet emissions requirements, so file each May 1 even while a relief application is pending.
Common mistakes we fix
- Missing the third-party verification of baseline data
- Using a verifier who isn’t certified by an approved verification body
- Grouping buildings in a way that doesn’t match the BEAM configuration
- Not omitting residential space from emissions in mixed-use buildings
- Forgetting the separate state LBER filing
How 1st Green Choice helps
We file Cambridge BEUDO reports for labs, offices, institutional and residential properties. We set up your BEAM account, request whole-building data from Eversource, verify baseline data with our in-house professional engineers and submit by May 1 — and handle your state LBER filing from the same data.
Related laws and services
Cambridge BEUDO questions
When is the Cambridge BEUDO deadline?
Which buildings are covered by BEUDO?
What are the BEUDO emissions requirements?
Do residential buildings have to reduce emissions?
Is third-party verification required?
Where do I report?
Can I get relief from BEUDO requirements?
Does the state LBER law also apply?
Official sources: City of Cambridge — BEUDO · BEUDO baseline technical guide. Requirements change — we confirm current rules for every filing.