Denver, CO · Reviewed November 2026

Energize Denver compliance, filed for you

Energize Denver Benchmarking & Building Performance Ordinance requires covered buildings in Denver to report energy use every year. We gather the data, check it, and file it — usually within a week.

Who’s covered

Commercial, multifamily, public, and manufacturing/agricultural/industrial buildings of 25,000 sq ft or more.

Annual deadline

June 1 for the previous calendar year.

Verification

Data verification is required for 25,000+ sq ft buildings on the city’s schedule.

Penalties

$2,000 for not benchmarking by the deadline; building performance fines are separate and can be much higher.

What is Energize Denver?

Energize Denver is the City and County of Denver’s building performance policy, run by the Office of Climate Action, Sustainability and Resiliency (CASR). It started as a benchmarking ordinance in 2016 and was expanded in 2021 into a full building performance standard.

Buildings of 25,000 sq ft or more must benchmark every year by June 1 and meet energy use intensity (EUI) targets set for their property type — on a path to roughly a 30% reduction from their 2019 baseline by 2030, with interim targets along the way. Smaller buildings of 5,000–24,999 sq ft have different requirements: upgrade to LED lighting or install on-site solar by a deadline based on their size.

Denver amended the ordinance again in May 2026, and for buildings subject to both programs, meeting Energize Denver’s efficiency requirements counts toward the statewide Building Performance Colorado targets.

Key dates

June 1Annual benchmarking report due for buildings 25,000+ sq ft
June 1, 2028Show you met the interim target (2027 data year)
June 1, 2031Show you met the final target (2030 data year), unless on an approved later timeline
Target yearsThird-party data verification required
Dec 31, 2026Small buildings 10,000–15,000 sq ft: LED lighting or solar requirement
Dec 31, 2027Small buildings 5,000–10,000 sq ft: LED lighting or solar requirement

Denver updates its rules regularly — most recently in 2026. We confirm your building’s targets, timeline and pathway before every filing.

Is your building covered?

Energize Denver applies to commercial, multifamily, public and manufacturing, agricultural and industrial (MAI) buildings in Denver:

  • 25,000 sq ft and larger — annual benchmarking plus EUI performance targets.
  • 5,000–24,999 sq ft — no annual benchmarking, but a one-time LED lighting or solar requirement on a staggered schedule.
  • MAI buildings — follow a separate pathway with prescriptive or performance options suited to industrial processes.

Each covered building has a Denver Building ID. New buildings start benchmarking after their first full year of operation.

What to report

All energy used by the whole building — including tenant spaces — for January 1 to December 31:

  • Electricity — every meter serving the building
  • Natural gas
  • District steam, hot or chilled water, if you have it
  • Delivered fuels (oil, diesel, propane) — all delivery receipts for the year
  • On-site solar production, if any
  • Water — we’ll confirm whether it’s required for your building

Leave out backup generator fuel. Note any meters added or removed during the year.

Good to know

  • Building performance targets apply in 2028 and 2032 for 25,000+ sq ft buildings.
  • Buildings of 5,000–24,999 sq ft have lighting or renewable energy requirements instead.
  • Colorado’s statewide program may also apply to buildings of 50,000+ sq ft.

What we’ll need from you

  • Building address, plus any utility service addresses that differ from it
  • Gross floor area for the whole building and each use (office, retail, residential…), number of units and year built
  • Your Denver Building ID (we can look it up)
  • Utility data for the full calendar year, January 1 – December 31 (usually 13 months of bills)
  • If tenants pay their own utilities: whole-building (aggregated) data from the utility, or signed tenant authorization forms
  • Access to your ENERGY STAR Portfolio Manager account, if you have one
  • Any notice or letter you received from the city
Step by step

How to comply

  1. Confirm your building ID and targetLook up your Denver Building ID and the EUI target assigned to your property type.
  2. Set up Portfolio ManagerEnter floor area, property uses and details, and add the Denver Building ID.
  3. Collect whole-building dataRequest aggregated data from Xcel Energy for electricity and gas, plus district steam or chilled water, delivered fuels and solar.
  4. Check data qualityFix gaps and outliers — your EUI is compared directly with your target, so errors can create a penalty that isn’t real.
  5. Verify in target yearsHave the data third-party verified in years when performance targets are assessed.
  6. Submit by June 1Send your data through Denver’s Portfolio Manager reporting link and keep the confirmation.
  7. Track your EUI against your targetSee how far you are from the next interim or final target, and consider an alternate compliance option if you need one.

Ways to comply with Denver’s targets

Meet your EUI target

Reduce energy use through efficiency upgrades, controls and operational changes until your EUI is at or below your target.

Alternate compliance options

Denver offers alternatives such as adjusted timelines and electrification-based paths for buildings that need more flexibility. Most require applying in advance.

Small-building options

Buildings of 5,000–24,999 sq ft can comply by upgrading to LED lighting or installing on-site solar that meets the city’s requirement.

Exemptions and extensions

Denver can grant timeline adjustments and alternate compliance options, but most must be applied for before the relevant deadline and approved by the city. Buildings facing financial hardship, major renovations or unusual uses may qualify for adjusted targets.

Failing to benchmark can bring fines of up to $2,000 a year. Missing a performance target brings a penalty based on the amount of energy above your target, so being close still matters.

If your building’s size or use has changed and the city’s records are wrong, contact CASR to correct them before targets are assessed.

Common mistakes we fix

  • Using the wrong property type, which assigns the wrong EUI target
  • Leaving out tenant-paid Xcel meters in multi-tenant buildings
  • Missing third-party verification in a target year
  • Not applying for an alternate compliance option before the deadline
  • Overstated or understated floor area that changes your EUI
  • Small buildings assuming no requirement because they don’t benchmark — LED or solar deadlines still apply

How 1st Green Choice helps

We file Energize Denver reports for offices, multifamily buildings, hotels, retail and mixed-use properties. We confirm your building ID and EUI target, request whole-building data from Xcel Energy, set up or clean up Portfolio Manager, verify data in target years and submit by June 1.

Each year we show where your EUI stands against your next target, so you know early whether you’re on track — and we file the same data for Colorado’s statewide program when your building is covered by both.

FAQ

Energize Denver questions

When is the Energize Denver benchmarking deadline?
June 1 each year for buildings of 25,000 square feet or more, covering the previous calendar year.
Which buildings are covered by Energize Denver?
Commercial, multifamily, public and MAI buildings in Denver. Buildings of 25,000+ sq ft benchmark annually and meet EUI targets; buildings of 5,000–24,999 sq ft have a one-time LED lighting or solar requirement.
What are the Energize Denver performance targets?
Each property type has an EUI target. Buildings follow a path to about a 30% reduction from their 2019 baseline by the final target year, with interim targets along the way.
What happens if I miss my Denver target?
The city assesses a penalty based on the energy used above your target, so the penalty grows with the size of the gap. Not benchmarking at all can bring separate fines of up to $2,000 a year.
Is third-party verification required in Denver?
Yes, in years when performance targets are assessed. We handle verification with your filing.
Does Energize Denver count for Colorado’s statewide program?
For buildings covered by both, Denver’s 2026 amendments mean that meeting Energize Denver’s efficiency requirements counts as meeting Building Performance Colorado’s targets. Both still require reporting.
What do small buildings in Denver need to do?
Buildings of 5,000–24,999 sq ft must upgrade to LED lighting or install on-site solar by a deadline that depends on size — December 31, 2026 for 10,000–15,000 sq ft and December 31, 2027 for 5,000–10,000 sq ft.
Can I get more time to meet my Denver target?
Denver offers timeline adjustments and alternate compliance options, but you usually have to apply and be approved before the deadline.

Official sources: Energize Denver — buildings 25,000 sq ft or larger. Requirements change — we confirm current rules for every filing.