The Pittsburgh Building Benchmarking Ordinance requires covered buildings to report energy and water use every year. We gather the data, check it, and file it — usually within a week.
Who’s covered
Non-residential buildings over 50,000 sq ft, including the non-residential part of mixed-use buildings when that part is 50,000 sq ft or more.
Annual deadline
June 1 for the previous calendar year.
Verification
No routine third-party verification — but the program runs its own data checks, so accuracy still matters.
Penalties
The city follows up with owners who don’t report and can issue citations — contact us if you’ve received a notice.
What is Pittsburgh’s Building Benchmarking Ordinance?
Pittsburgh adopted its Building Benchmarking Ordinance (Chapter 629 of the city code) in October 2016. Owners of large non-residential buildings must report a year of whole-building energy and water use through ENERGY STAR Portfolio Manager and share it with the City of Pittsburgh by June 1 each year.
The city publishes benchmarking results so the public can compare energy and water use among similar buildings, supporting the Pittsburgh 2030 District’s goal of cutting energy and water use 50% below baseline.
Key dates
| April 2 | Exemption requests due (60 days before the deadline) |
| June 1 | Annual energy and water benchmarking report due |
| After June 1 | City publishes results |
We confirm current Pittsburgh dates before every filing.
Is your building covered?
The ordinance covers:
- Non-residential buildings with 50,000 sq ft or more of indoor floor space.
- The non-residential portions of mixed-use buildings where at least 50,000 sq ft is non-residential.
- City facilities.
Multifamily residential buildings aren’t covered. The city publishes a searchable list of covered buildings by parcel ID.
What to report
All energy and water used by the whole building — including tenant spaces — for January 1 to December 31:
- Electricity — every meter serving the building
- Natural gas
- District steam, hot or chilled water, if you have it
- Delivered fuels (oil, diesel, propane) — all delivery receipts for the year
- On-site solar production, if any
- Water — whole-building water use
Leave out backup generator fuel. Note any meters added or removed during the year.
Good to know
- Low-performing buildings must complete an energy audit or retro-commissioning study every five years.
- Exemptions exist for low occupancy, demolition, hardship and primarily industrial use.
What we’ll need from you
- Building address, plus any utility service addresses that differ from it
- Gross floor area for the whole building and each use (office, retail, residential…), number of units and year built
- Your Pittsburgh Building ID (we can look it up)
- Utility data for the full calendar year, January 1 – December 31 (usually 13 months of bills)
- If tenants pay their own utilities: whole-building (aggregated) data from the utility, or signed tenant authorization forms
- Access to your ENERGY STAR Portfolio Manager account, if you have one
- Any notice or letter you received about this law
How to comply
- Search the covered buildings listFind your building by parcel ID or address.
- Request an exemption by April 2 if it appliesExemption requests need supporting documents.
- Set up Portfolio ManagerEnter floor area, property uses and details for the non-residential space.
- Collect whole-building energy and water dataRequest aggregated data from Duquesne Light and Peoples Gas or Columbia Gas, plus Pittsburgh Water.
- Share with the city by June 1Share the property with the City of Pittsburgh in Portfolio Manager and submit.
Exemptions and extensions
Exemptions are available if the building didn’t have a certificate of occupancy for all 12 months, a demolition permit was issued and legal occupancy ended, or average occupancy was below 50% for the year. Requests are due 60 days before the deadline (April 2) with supporting documents.
Pittsburgh enforces mainly through public disclosure of compliance, so non-compliance is visible to tenants and buyers.
Common mistakes we fix
- Missing the April 2 exemption deadline
- Leaving out water, which is required
- Benchmarking residential space in a mixed-use building when only the non-residential portion is covered
- Missing tenant-paid Duquesne Light meters
- Not sharing the property with the city correctly
How 1st Green Choice helps
We file Pittsburgh benchmarking reports for offices, hospitals, universities, hotels and retail. We request aggregated data from Duquesne Light and your gas utility, include water use, share the property with the city and submit by June 1.
Pittsburgh benchmarking questions
When is the Pittsburgh benchmarking deadline?
Which Pittsburgh buildings must benchmark?
Are apartment buildings covered?
When is the exemption deadline?
What exemptions are available?
Is water required?
Does Pittsburgh publish results?
Is verification required?
Official sources: City of Pittsburgh — Building Benchmarking Compliance. Requirements change — we confirm current rules for every filing.