Austin ECAD compliance, filed for you
The Austin Energy Conservation Audit and Disclosure Ordinance (ECAD) requires covered buildings to report energy use every year. We gather the data, check it, and file it — usually within a week.
Who’s covered
Commercial buildings of 10,000 sq ft or more served by Austin Energy (multifamily properties have separate audit rules).
Annual deadline
June 1 for the previous calendar year.
Verification
No routine third-party verification — but the program runs its own data checks, so accuracy still matters.
Penalties
Fines from $500 to $2,000.
What is Austin ECAD?
Austin’s Energy Conservation Audit and Disclosure (ECAD) ordinance, Chapter 6-7 of the City Code, has applied to buildings served by Austin Energy since 2009. It has different rules for different property types.
Commercial buildings of 10,000 sq ft or more must report an energy rating to the city by June 1 every year, using ENERGY STAR Portfolio Manager or Austin Energy’s own rating option, and disclose it to prospective buyers. Multifamily properties with five or more units must complete an energy audit by a qualified ECAD energy professional when the property turns 10 years old and every 10 years after, and share the results with current and prospective residents. Smaller homes need an audit before sale.
ECAD applies only within Austin city limits and only to buildings that receive electricity from Austin Energy.
Key dates
| March | Austin Energy mails compliance letters with reporting instructions |
| June 1 | Commercial energy rating due for the previous year |
| Year property turns 10 | Multifamily energy audit due, then every 10 years |
| Before sale | Disclose the rating or audit to prospective buyers |
We confirm current Austin Energy dates before every filing.
Is your building covered?
ECAD covers buildings inside Austin city limits that receive electricity from Austin Energy:
- Commercial buildings of 10,000 sq ft or more — annual energy rating.
- Multifamily properties with five or more units — energy audit every 10 years and disclosure to residents.
- Homes with four or fewer units — audit before sale.
Industrial and manufacturing buildings are exempt from the commercial rating requirement. Buildings served by other utilities (for example, outside the city) aren’t covered.
What to report
All energy used by the whole building — including tenant spaces — for January 1 to December 31:
- Electricity — every meter serving the building
- Natural gas
- District steam, hot or chilled water, if you have it
- Delivered fuels (oil, diesel, propane) — all delivery receipts for the year
- On-site solar production, if any
Leave out backup generator fuel. Note any meters added or removed during the year.
Good to know
- Multifamily buildings with five or more units need an energy audit every 10 years.
- Homes 10+ years old need an energy audit before sale.
What we’ll need from you
- Building address, plus any utility service addresses that differ from it
- Gross floor area for the whole building and each use (office, retail, residential…), number of units and year built
- Your Austin Energy ECAD ID (we can look it up)
- Utility data for the full calendar year, January 1 – December 31 (usually 13 months of bills)
- If tenants pay their own utilities: whole-building (aggregated) data from the utility, or signed tenant authorization forms
- Access to your ENERGY STAR Portfolio Manager account, if you have one
- Any notice or letter you received about this law
How to comply
- Check your Austin Energy letterIt explains your reporting option and building identifier.
- Set up Portfolio ManagerEnter floor area, property uses and details for the building.
- Collect energy dataAustin Energy can supply whole-building electricity data; add Texas Gas Service and any other fuels.
- Report the rating by June 1Submit through Portfolio Manager or Austin Energy’s Key Code reporting option.
- Disclose when sellingProvide the rating to prospective buyers before the contract is signed.
ECAD for multifamily properties
10-year energy audit
A qualified ECAD energy professional audits the property in the year it turns 10, and every 10 years after.
Disclosure to residents
Audit results must be shared with current and prospective residents.
Improvements for high users
Properties found to use significantly more energy than similar properties may be required to make improvements.
Exemptions and extensions
Austin Energy can grant exemptions for certain properties — including manufacturing buildings and some multifamily properties that recently completed qualifying efficiency work through Austin Energy programs.
Non-compliance can bring fines ranging from $500 to $2,000.
Common mistakes we fix
- Assuming a building outside city limits or served by another utility is covered
- Missing tenant-paid electricity in multi-tenant buildings
- Forgetting to disclose the rating to buyers
- Multifamily owners missing the 10-year audit
- Using a floor area that doesn’t match appraisal district records
How 1st Green Choice helps
We report ECAD energy ratings for Austin offices, retail, hotels and mixed-use buildings, set up Portfolio Manager with Austin Energy data and submit by June 1.
Austin ECAD questions
When is the Austin ECAD deadline?
Which Austin buildings are covered by ECAD?
Do multifamily properties benchmark annually?
What are the ECAD penalties?
Do I have to use Portfolio Manager?
Are industrial buildings covered?
Does ECAD apply outside Austin city limits?
Do I need to disclose my rating when I sell?
Official sources: Austin Energy — ECAD for commercial buildings · Austin Energy — ECAD ordinance. Requirements change — we confirm current rules for every filing.
