The Orlando Building Energy and Water Efficiency Strategy (BEWES) requires covered buildings to report energy use every year. We gather the data, check it, and file it — usually within a week.

Who’s covered

Privately owned buildings over 50,000 sq ft and city buildings over 10,000 sq ft (industrial, theme park and some other uses are exempt).

Annual deadline

May 1 for the previous calendar year.

Verification

No routine third-party verification — but the program runs its own data checks, so accuracy still matters.

Penalties

The city follows up with owners who don’t report; contact us if you’ve received a notice.

What is Orlando BEWES?

Orlando’s Building Energy and Water Efficiency Strategy (BEWES), adopted in 2016, requires large buildings to benchmark their energy and water use in ENERGY STAR Portfolio Manager and report it to the city by May 1 each year. The city publishes the results each fall.

BEWES also has a performance element. Buildings with an ENERGY STAR score below 50 — the national median — must complete an energy audit or retro-commissioning of base building systems once every five years. High performers are exempt. The program is run by the City of Orlando’s Office of Sustainability & Resilience.

Key dates

January–AprilRequest aggregated data from OUC or Duke Energy and your gas provider
May 1Annual energy and water benchmarking report due
FallCity publishes benchmarking results
Every 5 yearsAudit or retro-commissioning for buildings scoring below 50 (cycles began in 2020 and 2025)

We confirm current Orlando dates and your audit cycle before every filing.

Is your building covered?

BEWES covers privately owned commercial and multifamily buildings over 50,000 gross sq ft and city-owned buildings over 10,000 sq ft in the City of Orlando. Buildings in surrounding Orange County are not covered.

What to report

All energy used by the whole building — including tenant spaces — for January 1 to December 31:

  • Electricity — every meter serving the building
  • Natural gas
  • District steam, hot or chilled water, if you have it
  • Delivered fuels (oil, diesel, propane) — all delivery receipts for the year
  • On-site solar production, if any

Leave out backup generator fuel. Note any meters added or removed during the year.

Good to know

  • Water reporting is strongly encouraged though not required.
  • Low-performing buildings must complete an energy audit or retro-commissioning every five years.

What we’ll need from you

  • Building address, plus any utility service addresses that differ from it
  • Gross floor area for the whole building and each use (office, retail, residential…), number of units and year built
  • Your Orlando BEWES ID (we can look it up)
  • Utility data for the full calendar year, January 1 – December 31 (usually 13 months of bills)
  • If tenants pay their own utilities: whole-building (aggregated) data from the utility, or signed tenant authorization forms
  • Access to your ENERGY STAR Portfolio Manager account, if you have one
  • Any notice or letter you received about this law
Step by step

How to comply

  1. Confirm your building is coveredCheck the city’s list or your notice.
  2. Set up Portfolio ManagerEnter floor area, property uses and details.
  3. Collect whole-building energy and water dataRequest aggregated data from Orlando Utilities Commission (OUC) or Duke Energy, plus gas and water.
  4. Submit by May 1Report through the city’s Portfolio Manager data request.
  5. Check your ENERGY STAR scoreIf it’s below 50, plan an energy audit or retro-commissioning for your five-year cycle.

Audits and retro-commissioning

Who must do it

Buildings with an ENERGY STAR score below 50 (or equivalent EUI) complete an audit or retro-commissioning every five years.

Performance pathway

Buildings scoring 50 or higher — or showing other qualifying performance — aren’t required to audit.

Help from OUC

OUC customers may be eligible for free audit services through the utility.

Exemptions and extensions

Buildings can request exemptions — for example, if they’re below the size threshold, facing financial hardship or pending demolition. The city provides exemption request forms.

Non-compliant buildings are listed publicly as not compliant, which can affect tenants and property value.

Common mistakes we fix

  • Leaving out water, which is required
  • Not checking whether a score below 50 triggers an audit
  • Missing tenant-paid OUC or Duke meters
  • Assuming a building in unincorporated Orange County is covered
  • Overlooking the free OUC audit service

How 1st Green Choice helps

We file Orlando BEWES reports for offices, multifamily, hotels and retail, request aggregated data from OUC or Duke Energy, include water use and submit by May 1. If your score is below 50, our PEs can coordinate the audit or retro-commissioning — or help you raise the score first.

FAQ

Orlando BEWES questions

When is the Orlando BEWES deadline?
May 1 each year for the previous calendar year’s energy and water use.
Which Orlando buildings are covered?
Privately owned commercial and multifamily buildings over 50,000 sq ft and city-owned buildings over 10,000 sq ft.
When is an audit required?
Buildings with an ENERGY STAR score below 50 must complete an energy audit or retro-commissioning once every five years.
Is water required?
Yes. BEWES requires energy and water benchmarking.
Can I get a free audit?
OUC customers may be eligible for free audit services through the utility.
What happens if I don’t comply?
The city lists non-compliant buildings publicly.
Does BEWES apply in Orange County?
No — only the City of Orlando.
Is verification required?
No routine third-party verification is required.